OH

Maintenance & Service Workflow

Property service requests from intake through evidence-backed closure: triage, SLA clocks with auditable pause rules, vendor dispatch, landlord approval, cost capture, rework, escalation and tenant satisfaction.

OPS-04
Open work orders
47
Prototype Residences A & B
Emergency active
2
Escalation paths running
SLA at risk / breached
5 / 3
This month, resolve-SLA basis
Avg first response
38m
−7m vs June
Tenant satisfaction
4.4 / 5
128 surveys (90d)
Work order queue
WOUnit / locationCategoryUrgencySLA clockStatusOwnerVendorCost (AED)
WO-2026-01188
PR-A-1104
Tenant: A. N●●● (portal)
Plumbing · leakEmergency Resp. met 19m
Resolve due 13:12
In progress
EPE. Petrova
GulfTech Facilities LLC
WO-2026-01185
PR-B-2207
Tenant present required
HVAC · not coolingHigh 1h 12m left
Resolve SLA 4h
Vendor dispatched
EPE. Petrova
GulfTech Facilities LLC515.00
WO-2026-01181
PR-A-903
Owner: Noor Development Group
Doors · lock jammedMedium Paused · LP-02
Awaiting landlord approval
On hold — landlord approval
OHO. Haddad
620.00 est.
WO-2026-01179
Building B · lobby
Common area
Electrical · light flickerLow 62h left
Resolve SLA 72h
Assigned · in-house
EPE. Petrova
In-house team
WO-2026-01174
PR-B-1402
Recurrence within 14 days
Plumbing · water heaterHigh Rework clock 6h
No extra charge to landlord
Rework
EPE. Petrova
GulfTech Facilities LLC890.00
WO-2026-01169
PR-A-2011
Balcony drainage
Civil · drainageMedium Breached +9h
Escalated to Ops manager
Escalated
RFR. Al Farsi
GulfTech Facilities LLC1,150.00 est.
WO-2026-01166
PR-B-3204
Kitchen cabinet hinge
CarpentryLow Met Completed — evidence review
EPE. Petrova
In-house team85.00
WO-2026-01158
PR-A-101
Intercom fault
ELV · intercomMedium Met Closed · CSAT 5/5
OHO. Haddad
GulfTech Facilities LLC240.00
WO-2026-01142
PR-A-1607
Bathroom exhaust fan
HVAC · extractMedium Met Closed · CSAT 4/5
EPE. Petrova
GulfTech Facilities LLC310.00
9 of 47 open + recent

Work order detail — WO-2026-01185 · HVAC not cooling · PR-B-2207

Intake (tenant portal)
Triage · High
Assignment
Vendor dispatch
Work & evidence
Tenant confirmation
Closed
Vendor dispatch — GulfTech Facilities LLC
Dispatched 11:05
Technician
S. Pillai · HVAC (GulfTech badge GT-0417)
ETA / window
13:30 · access window 13:00–17:00
Access constraints
Tenant present required · pets on premises · no master key use
Tenant contact
+971 5● ●●● ●412 (revealed to vendor only during active dispatch)
AMC coverage
HVAC AMC-2026-08 · call-out included
Vendor portal
Work pack shared — scoped to this WO

Parts & cost capture
LineQtyUnit (AED)Total (AED)
R-410A refrigerant top-up0.8 kg225.00180.00
Fan capacitor 35 µF195.0095.00
Labor (HVAC tech)2.0 h120.00240.00
Call-out fee10.000.00 (AMC)
Estimated total (chargeable to landlord)AED 515.00
Send cost estimate for landlord approval

Consequence: resolve-SLA clock pauses (rule LP-02) until the landlord responds; tenant portal status changes to "Awaiting owner approval". Affected record: WO-2026-01185 · PR-B-2207.

Recovery: if rejected, WO returns to Triage with rejection reason; tenant is notified with a revised plan.
Tenant-visible status (portal mirror)
Sanitized view
  • 17 Jul 2026 · 08:47
    Request received
    "A/C not cooling in bedroom 2" · photos (2) attached
  • 17 Jul 2026 · 09:20
    Technician assigned
    GulfTech Facilities · visit window 13:00–17:00 today
  • 17 Jul 2026 · 11:05
    Technician on the way
    ETA 13:30 · please ensure an adult is present
  • Pending
    Work in progress → completion confirmation
    You will be asked to confirm and rate the visit

Internal notes, owner cost approvals and vendor pricing are never shown in the tenant portal.

Completion evidence — WO-2026-01166 (review)
Before / after photos
IMG_4412.jpg, IMG_4418.jpg · geotag Building B · 16 Jul 16:41
Technician sign-off
In-house team · checklist CHK-CARP-02 complete
Tenant confirmation
OTP pending — reminder scheduled 18 Jul 09:00
Satisfaction survey
Sent on closure · 5-point scale
SLA matrix & pause rules (configured, auditable)
Edit in workflow configurator
UrgencyResponseResolveEscalation path
Emergency30 min4 hL1 duty tech → L2 Ops manager → L3 Property director
High2 h4 h*L1 → L2 Ops manager
Medium8 h24 hL1 → L2 after breach
Low24 h72 hWeekly review
Pause ruleTriggerAudit
LP-01Awaiting tenant access windowLogged with actor + reason
LP-02Awaiting landlord approvalLogged with actor + reason
LP-03Parts on order > 48h (needs Ops manager approval)Approval required

*High resolve SLA for HVAC in summer months per seasonal profile. All SLA edits are versioned configuration — see Version & Approval; every pause/resume appears in the Audit Explorer.

Static render mockup — no live data. Source: ERP Modern Development Specification v2.0 · Covers: OPS-04 (maintenance and service workflow) · Related: OPS-02 tenant/landlord portals, OPS-03 vendor portal.