OH

Smart Access & Offline Field Use

Access-device health, approved offline field workflows with encrypted storage, limited fields and expiry, a sync conflict queue where nothing is silently overwritten, and relationship-linked passes with prompt revocation.

OPS-08
Access devices
26
24 online · 1 degraded · 1 offline > 24h
Offline sessions active
3
All on approved workflows only
Sync conflicts open
1
Resolution task TSK-2026-0788
Active passes
58
6 expire today · 2 auto-revoked this week
Field app mode
PWA
Responsive-first · offline by approval only
Access device health
feeds via operational device integrations · provider health
DeviceTypeLocationFirmwareLast heartbeatBatteryStatus
ACC-G1Barrier + ANPRPlot P1 · Gate G14.2.113:58 (1 min ago)Online
ACC-G2BarrierPlot P1 · Gate G24.2.113:58Online
TRN-L1Lobby turnstileBuilding A · lobby2.9.013:57Online
LCK-A-1104Smart lockPR-A-11041.6.313:4118%Degraded · low battery — WO queued
LCK-B-2207Smart lockPR-B-22071.6.316 Jul 11:52 (26 h)64%Offline > 24h · task TSK-2026-0781
CAM-ANPR-P1ANPR cameraPlot P1 · lane 23.3.713:58Online
KSK-P2Pay kioskPlot P25.1.013:56Card reader fault 13:00–13:10 · monitoring
HND-07Handheld (field)Tariq Aziz · Building A roundsPWA 26.7.1Offline since 09:10 (expected)71%Offline session · encrypted
HND-03Handheld (field)Spare · Ops officePWA 26.7.113:5598%Online
9 of 26 devices
Approved offline workflows
approval in Configuration Center
WorkflowCached field scopeEncryptionCache expiryStatus
OFW-01 · Inspection checklist capture
Checklist items, results, photos, severity — no tenant PIIAES-256 container72 hApproved · cfg v12 (V. Nair)
OFW-02 · Utility meter readings
Monthly rounds
Meter ID, reading, photoAES-256 container24 hApproved
OFW-03 · Move-out snagging
Unit condition capture
Room checklist, damage photos, cost classAES-256 container48 hApproved
OFW-04 · Offline lead capture
Requested by Sales
Would cache contact personal dataRejected — personal data offline not approved
OFW-05 · Parking manual check-in fallback
For gate/device outage
Plate, ticket stub, timestampAES-256 container12 hPending approval
Offline sessions
User / deviceWorkflowStartedExpiresRecordsState
Tariq Aziz · HND-07
Facilities inspector
OFW-0117 Jul 09:1020 Jul 09:1014Reconnected — 1 conflict
GulfTech tech S. Pillai · vendor app
Scoped via vendor portal
OFW-0317 Jul 11:3019 Jul 11:306Active offline
In-house team · HND-03
Meter rounds, basement
OFW-0217 Jul 13:0518 Jul 13:0542Active offline
E. Petrova · tablet
Snagging PR-A-903
OFW-0315 Jul 10:0017 Jul 10:000Expired — cache auto-purged
Tariq Aziz · HND-07
Previous rounds 15 Jul
OFW-0115 Jul 08:4011Synced clean 15 Jul 16:02
Sync conflict queue
1 open
ConflictRecord / fieldOffline versionServer versionResolution taskStatus
CONF-0114
INS-2026-0341 · corridor 11 emergency lighting
Field: finding severity
"Major" — Tariq Aziz · 11:42 (offline) "Critical" — Elena Petrova · 12:03 (server) TSK-2026-0788 → Facilities manager Open
CONF-0109
MTR-B1-0442 · meter reading
Field: reading value
04471.2 — HND-03 · 14 Jul 04471.2 — portal entry · 14 Jul Auto-merged (identical values) Resolved · no action
Resolve sync conflict CONF-0114 — INS-2026-0341

Consequence: the chosen value becomes the record of the fire-safety finding F-0912; the losing version stays in history with its author and timestamp. Affected downstream: follow-up WO priority and statutory report.

Recovery: resolution can be re-opened by the facilities manager; all versions remain in the audit trail.
Visitor & access passes
PassHolderLinked relationshipScopeValid windowStatus
PAS-2201
Amina Noor
Prospect · QR visitor pass
Viewing VW-2026-0912 · PR-B-2207Building B lobby + floor 2217 Jul 14:00–16:00Active
PAS-2199
S. Pillai · GulfTech
Vendor technician
Work order WO-2026-01185Building B service core + PR-B-2207While WO active (window 13:00–17:00)Active
PAS-2190
ProLift crew (3)
Contractor
Permit PTW-2026-117Lift shaft L2 + roof access17–18 Jul 07:00–15:00Active
PAS-2187
GulfTech tech M. Farouk
Vendor technician
WO-2026-01101 (closed 15 Jul)Building A service coreEnded with work orderAuto-revoked on WO closure
PAS-2178
Tenant move-in · PR-B-2207
Name masked: R. K●●●
Tenancy start 16 Jul 2026Loading bay + freight lift16 Jul 08:00–20:00Expired
PAS-2165
Prime Link Realty agent
External broker
Co-broke viewing (relationship ended)Building A lobbyRevoked 14 Jul 09:20Revoked — relationship ended

Passes are issued only against a current relationship (viewing, work order, permit, tenancy) and revoke promptly when it ends — external identities are governed in External Identity & Relationship-scoped Access.

Static render mockup — no live data. Source: ERP Modern Development Specification v2.0 · Covers: OPS-08 (smart access, responsive field use and offline scope) · Related: OPS-05 inspections, OPS-03 vendor portal, INT device integrations, §17.1 offline rules.